• / 52
  • 下载费用:10 金币  

设备施工方案(英文版).doc

关 键 词:
设备施工方案(英文版).doc
资源描述:
陕西建工安装集团有限公司 SCEGC Installation Group Co., Ltd1陕西有色天宏瑞科硅材料有限责任公司Shaanxi Nonferrous Tianhong REC Silicon Materials Co., Ltd 电子及光伏新材料产业化项目 Silane 硅烷区机电安装工程M part of the equipment is small, can the overall arrival. For larger, in does not affect the hoisting of the premise, as far as possible to complete the work protection installation, anti-corrosion, insulation and subsidiary pipeline installation. Part of the equipment size is not big, can the overall arrival. The volume is large, without affecting the lifting the premise, as far as possible to complete the labor protection, anti-corrosion, insulation and subsidiary pipeline installation.有些大型超限(超高、超重)设备需单独编制专项施工方案。Some large scale (super high, overweight) equipment requires preparing special construction program.3.1 设备安装前应具备的条件3.1. Conditions prior to the installation works3.1.1 设备验收必须具备下述技术文件:3.1.1. Related document and specification for equipment acceptance 3.1.1 Equipment acceptance must have the following technical documents:(1)设备出厂合格证、说明书;(1).Equipment factory certificate, specification;(2)质量证明书;(2).Certificate of quality;陕西建工安装集团有限公司 SCEGC Installation Group Co., Ltd6(3)需要热处理的设备,要检查设备内外垫板、固定件的位置、数量、规格是否符合设计文件的规定。(3).The need for heat treatment equipment, to check the equipment inside and outside the plate, fixed position, quantity, specifications are in line with the provisions of the design documents.3.1.2 设备按以下内容进行检查:3.1.2. Equipment Inspection methods(1)箱号、箱数及包装情况;(2)设备名称、规格、型号、特性;(3)设备的外形尺寸和管口方位应符合设计文件要求;(3).Equipment size and nozzle orientation should meet the requirements of design documents;(4)设备表面不得有变形和超过规范允许的划痕、锈蚀;(4) .The surface of the equipment shall not be deformed and exceed the allowable marks, corrosion;(5)设备内件及附件的规格、尺寸、数量应符合图纸要求;(5) Specifications, dimensions and quantities of equipment and accessories shall conform to the requirements of the drawing;(6)设备存放时,应合理支垫、敞口部位应加盖临时盲板。(6). when the equipment is stored, should be reasonable support pad, open mouth parts should be stamped with a temp
展开阅读全文
  微传网所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。
0条评论

还可以输入200字符

暂无评论,赶快抢占沙发吧。

关于本文
本文标题:设备施工方案(英文版).doc
链接地址:https://www.weizhuannet.com/p-9787800.html
微传网是一个办公文档、学习资料下载的在线文档分享平台!

微传网博客

网站资源均来自网络,如有侵权,请联系客服删除!

 网站客服QQ:80879498  会员QQ群:727456886

copyright@ 2018-2028 微传网络工作室版权所有

     经营许可证编号:冀ICP备18006529号-1 ,公安局备案号:13028102000124

收起
展开